Skytrain Extension
Vancouverites are very excited about the new SkyTrain extension that is in full swing, the first of three lines should be completed ahead of the 2010 Olympics! The Greater Vancouver Transport Authority (Translink) is responsible for operation and development of the system which already
has a network of two lines running 49.5 km around the city center.
The SkyTrain network is being extended by 30.5km with the construction of the Canada Line and the Evergreen Line. Construction of the 19.5km Canada line has been underway since Sept 2007and is due open in 2009. The Evergreen Line was originally planned to open around the same time, but due to costs the lines opening has been pushed back till 2011.
Tags: B5media, British-Columbia, Transportation, VancouverRelated Stories
POSTED IN: Announcements, Getting Around - Local Transportation, Miscellaneous

0 opinions for Skytrain Extension
No one has left a comment yet. You know what this means, right? You could be first!
Have an opinion? Leave a comment: